Weekly report — work week 2 combined (2026-W33 + 2026-W34)
- Period: 2026-08-10 ~ 2026-08-23
- Stage: stage 1 research and backtesting kickoff
- Status: in progress
On the site, the experiments, verdicts and research logs created in 2026-W34 are also shown on this work-week-2 page. Each record's actual creation date and permanent URL are preserved as they are.
Combined follow-up records
- Added the full-period
EXP-003C4 baseline backtest and itsrejectedverdict. - Identified consistency problems among cost, target price and holding period, and interpreted the C4 hypothesis itself separately from the current execution contract.
- The trade and signal ledgers and the 2026-08-20 research log are linked from the same page.
This week's goals
- Fix the common contract and report structure of the strategy research repository.
- Finalize the measurement items and pass criteria for CREON sample collection.
- Separate the validation scopes of
bnf_daily,bnf_intradayandorb.
Work done
- Organized the common validation philosophy and folder boundaries based on the README.
- Wrote the decision log and the data, execution, experiment and report policies.
- Registered three strategies in the strategy catalog as
proposal. - Implemented the CREON continuation-query adapter, a sample-collection CLI, and CSV, manifest and
EXP-001report output. - Measured the longest CREON daily, 1-minute and 5-minute histories for Samsung Electronics (
A005930) and generated theEXP-001coverage report containing the source hashes. - Implemented a reusable daily backtest kernel and
bnf_daily_c4_baseline, and ranEXP-002. - Implemented the symbol master, symbol history, corporate-action ledger and date-based universe contract for all-symbol expansion, and the
REF-001audit script.
Strategy, data and experiment status
| Item | Status | Evidence |
|---|---|---|
bnf_daily | proposal | C1~C4, universe and exit formulas not fixed |
bnf_intraday | proposal | Intraday data range and quality not measured |
orb | proposal | Intraday rules and execution model not fixed |
| CREON collector | Implemented and measured | Confirmed in a 32-bit Python, pywin32, CREON Plus logged-in session |
| Samsung Electronics daily | Data secured | 1980-01-04~2026-08-11, 12,372 records, longest server history |
| Samsung Electronics 1-minute | Data secured | 2024-07-18~2026-08-11, 190,436 records, longest server history |
| Samsung Electronics 5-minute | Data secured | 2021-07-01~2026-08-11, 96,215 records, longest server history |
bnf_daily_c4_baseline | backtested (draft) | 58 trades, total return -48.09%; C4 alone gives no grounds for adoption |
| All-symbol reference data | Implemented; collection pending | D-008, docs/reference-data.md, REF-001 audit contract |
Performance metrics
Per EXP-002, the C4-only baseline is a negative result. It is a single symbol and a recent period, without C1~C3 or regimes, so it is not interpreted as a profitability or failure verdict on full BNF.
Risks and decision requests
- A long-range data correction/exclusion policy is needed for the 2 OHLC-relationship anomalies in 1984 daily bars.
- BNF's C1~C3 formulas, sector classification and exact definitions of stop, take-profit and time exit are needed.
- ORB's catalyst filter and intraday entry/exit rules must be received as a separate specification.
Completion criteria for next week
- Collect the KRX symbol master, delisting history and DART corporate-code mapping to generate
REF-001. - Build the all-symbol daily collection queue, then accumulate per-symbol manifests.
- Complete the comparison of the corporate-action ledger against original filings and effective dates, and the verdict on the 2 long-range OHLC anomalies.
Source and migration evidence
Source: reports/weekly/2026-W33.md
Original SHA-256: 82c56cc333227165b37cff272ffffec88f90c684b83df01742e32da7556da49c
Raw data and account information are not part of the public package. The original results do not replace statistical or scientific revalidation. The English text is a translation; numbers, tables and charts are carried over unchanged.