QuantProp. Analyze a trade file ↗
stockback / Verdict record

EXP-009 verdict — Connors RSI(2) 5-minute cost and slippage confirmation

EXP-009 verdict: 0 of 14 out-of-sample cells were positive at provisional costs or 2bp slippage, so the 5-minute RSI(2) contract was held.

Original record: 2026-09-04 · Migrated: 2026-10-27 · Translated from Korean: 2026-10-27
A historical record, not rerun in this migration.

The figures, hypotheses and verdicts of the time are preserved. A past positive result or candidate mention does not mean validated profitability today or a live-trading recommendation. Validation periods that were already used are not treated as new independent validation.

This is an English translation of a preserved Korean original. It describes conditions at the time of writing, not current provider specifications, costs or regulations.

EXP-009 verdict — Connors RSI(2) 5-minute cost and slippage confirmation

  • Run date: 2026-09-04
  • Execution model: gpt-5.6-luna / high
  • Verdict: hold

Under the provisional per-product cost values, 0 of 14 OOS cells were positive, and at 2bp one-way slippage 0 of 14 were positive as well. Therefore the current 5-minute signal/exit/3,000,000 KRW 95% compounding contract is not expanded to more symbols or promoted to a live-trading candidate.

This verdict carries the limits of a 2-symbol, roughly 5-year pilot and of unconfirmed actual CREON execution fees. The existing daily results and EXP-006/007 are preserved. A new experiment ID is registered only when fees are confirmed, a point-in-time universe exists, or the signal itself is independently redesigned.

Detailed results are in the 0, and the design is in the 1.

Source and migration evidence

Source: reports/verdicts/EXP-009-connors-rsi2-m5-confirmation.md

Original SHA-256: 969c50b4c8024d326a75cdefaa3d0664d7c5cf06a3048c3db127c3a04184edab

Raw data and account information are not part of the public package. The original results do not replace statistical or scientific revalidation. The English text is a translation; numbers, tables and charts are carried over unchanged.